Hill Hall
Replace two AHUs in 1961 Bldg
Click a photo for larger image
R&R 2005
AHU coil access and chilled water piping.jpg
Corroded CW coil frame.jpg
Corroded CW coil frame2.jpg
Heating hot water tank.jpg
Plastic drip pan beneath air handlers.jpg
Return air ductwork.jpg
Supply air ductwork and damper actuators.jpg
Supply air ductwork and preheat coil.jpg