![]() |
|||||||||
Facilities Planning and Construction |
Engineering Information Services | ||||||||
| EIS Home | | | Maps, Survey and GIS | | | Space Information System and Plan Room | | | Facilities Condition Assessment | |||
2005 Projects from the Reserve For Repairs and Renovaton (Friday Center & Carrington Hall) |
|
|||||
Project Information: These two buildings suffer from aging HVAC systems and poor indoor air quality. Occupant health is at risk. Carrington Hall will require a system replacement and Friday Center may require extensive modification and repairs or a total replacement. These funds will provide for an engineering study that will give the University options to identify the best solution to the problem. |
|||||
Project Related Sites: Project Location Map
|
|||||