2003-04 Projects from the COPs Reserve For Repairs and Renovaton (COPs R&R) Printable Version PDF List
Year Building Project Category Project Title Project Budget Project Designer Planning Manager Project Resource & FCAP Contact Photos Status (update March 21, 2006)
Roof Repairs and Replacements  
2003 Davie Hall Roof Replacement Metal Roof Replacement (original wing) 247,879 Rooftop Systems Engineers Paul Kapp Geoffrey Lee Completed
2003 Howell Hall Roof Replacement Metal Roof Replacement 464,893 Rooftop Systems Engineers Paul Kapp Geoffrey Lee Completed
2003 Mary Anne Smith Building Roof Restoration Slate Roof Restoration 250,241   Dianne Bachman Geoffrey Lee Project funding transferred to Swain Hall (Arts Common Phase I)
2003 Caldwell Hall Roof Replacement Roof Replacement (1912 clay tile sector and single ply EPDM sector) 435,008 Stafford Consulting Engineers Paul Kapp Geoffrey Lee Completed
2003 Bynum Hall Roof Restoration Roof Restoration (1905 slate) 286,501 Stafford Consulting Engineers Paul Kapp Geoffrey Lee Completed
2003 Phillips Hall & Annex Roof Restoration Slate Roof and Low Slope Roof Sectors Restoration 1,431,828 Rooftop Systems Engineers Peter Krawchyk Geoffrey Lee Completed
2003 Hanes Hall Roof Restoration Slate Roof Restoration 461,426 Pearce Brinkley Cease + Lee Diane Gillis Geoffrey Lee Estimated construction start November 2006
2004 Person Hall Roof Replacement Roof Replacement 277,170 Hagersmith Design Craig Baker Geoffrey Lee Estimated construction start June 2006
Structural Repairs  
2003 New East Structural Repairs Exterior Stucco Restoration 405,526 J.K. Opperman / Dave Fischetti Paul Kapp Geoffrey Lee Completed
2003 Carmichael Auditorium Structural Repairs Replace Failing Pre-Cast Concrete Panel System 278,903 A&E Services Danny Williams Geoffrey Lee Project cancelled
2003 FPG Child Dev. Center, Alumni Hall, Howell Hall & Bingham Hall Structural Repairs Foundation Water-Proofing 472,450 A&E Services A&E Services Geoffrey Lee

Completed
2003 Mary Anne Smith Building Structural Repairs Foundation Water-Proofing, Mortar & Termite Damage Repair 180,335   Dianne Bachman Geoffrey Lee Project funding transferred to Swain Hall (Arts Common Phase I)
2003 Phillips Hall Structural Repairs Repair Exterior Masonry to Prevent Moisture Intrusion 559,050 J.K. Opperman / Dave Fischetti Paul Kapp Geoffrey Lee Completed
2003 Hanes Hall Structural Repairs Foundation Water-Proofing and Perimeter Drain Repairs 548,199 Pearce Brinkley Cease + Lee Diane Gillis Geoffrey Lee Estimated construction start November 2006
2003 Gardner Hall Structural Repairs Foundation Water-Proofing and Perimeter Drain Repairs 219,532 A&E Services A&E Services Geoffrey Lee Completed
Repairs to Electrical, Plumbing and Heating, Ventilating, and Air-Conditioning Systems  
2003 Brinkhous-Bullitt Building HVAC System Replace HVAC System to Address IAQ 6,684,185 Clark Richardson & Biskup Bill McGraw Brad Davis Construction documents in review
2003 Fordham Hall HVAC System Repairs to HVAC System to Address IAQ 131,498 A&E Services Facilities Services Brad Davis Schematic design phase
2003 Hanes Hall Electrical Systems Electrical Improvements 348,195 Pearce Brinkley Cease + Lee Diane Gillis Joel Carlin Estimated construction start November 2006
2003 Hanes Hall HVAC System Extend HVAC Air Distribution and Temperature Control Systems 1,098,903 Pearce Brinkley Cease + Lee Diane Gillis Brad Davis Estimated construction start November 2006
2003 Hanes Hall Interior Interior Renovations of 1st and 3rd Floors 1,048,208 Pearce Brinkley Cease + Lee Diane Gillis Geoffrey Lee Estimated construction start November 2006
2003 Person Hall HVAC System Replace HVAC Systems 562,398 Hagersmith Design Craig Baker Brad Davis Estimated construction start June 2006
2003 Dental Research Building HVAC System Replace HVAC System 4,364,835 Engineered Designs Keith Snead Brad Davis Design development phase
2003 Mary Anne Smith Building HVAC System Replace DX & Window A/C with Central HVAC System 1,151,993   Dianne Bachman Brad Davis Project funding transferred to Swain Hall (Arts Common Phase I)
2003 Medical School Wings B, C, D, E & F HVAC System Replace HVAC Systems 766,708 Polytech, Inc. Jerry Guerrier Brad Davis CD/ Awaiting BOI approval / Estimated construction start May 2006
2003 MacNider Hall HVAC System Install Pre-Heat Coils to Allow Outside Air into HVAC System (Advanced Planning) 346,499 A&E Services Bill Roach Brad Davis Design development phase
2003 Phillips Hall HVAC & Electrical HVAC & Electrical Upgrade to Computing Room 37D 114,257 A&E Services A&E Services Brad Davis Completed
2004 Dental Office Building HVAC System HVAC Replacement 604,735 Sigma Engineered Solutions Keith Snead Brad Davis Completed
Improvements to Meet Requirements of the Americans with Disabilities Act  
2003 Campus-wide ADA Continuation of Campus-Wide ADA Program 211,854   Michael Pierce Geoffrey Lee Ongoing
Improvements to Meet Fire Safety Needs  
2003 Brinkhous-Bullitt Building Fire Alarm System Replace Existing Fire Alarm System 275,778 Clark Richardson & Biskup Bill McGraw Joel Carlin Construction documents in review
2003 McGavran-Greenberg Hall Fire Sprinkler System Install Fire Sprinkler Protection 1,018,518 Sigma Engineered Solutions Bill McGraw Brad Davis Estimated construction start March 2006
2003 Hanes Hall Fire Sprinkler System Install Fire Sprinkler Protection 467,227 Pearce Brinkley Cease + Lee Diane Gillis Brad Davis Estimated construction start November 2006
2003 Mary Anne Smith Building Fire Protection Install Fire Sprinkler Protection and Fire Alarm System 278,273   Dianne Bachman Brad Davis Project funding transferred to Swain Hall (Arts Common Phase I)
2003 Wilson Library Fire Protection Correct Life Safety Egress Deficiencies 424,337 Davis Kane Michael Pierce Joel Carlin  
Improvements to Existing Facilities for Energy Efficiency  
2003 Hanes Hall Window Systems Window Replacement 426,150 Pearce Brinkley Cease + Lee Diane Gillis Geoffrey Lee Estimated construction start November 2006
2003 Bynum Hall Window Systems Window Replacement 191,217 John B. Hawkins, AIA Diane Gillis Geoffrey Lee Estimated construction completion August 2006
2003 Howell Hall Window Systems Window Replacement 693,511 John B. Hawkins, AIA Diane Gillis Geoffrey Lee Estimated construction completion August 2006
2003 Alumni Hall Window Systems Window Replacement 295,887 John B. Hawkins, AIA Peter Krawchyk Geoffrey Lee Estimated construction completion August 2006
2003 Medical School Wings B, C, D, E & F Window Systems Window Replacements 221,201 Polytech, Inc. Jerry Guerrier Geoffrey Lee Estimated construction start May 2006
2003 Old Clinic Window Systems Window Replacement 571,097 Polytech, Inc. Jerry Guerrier Geoffrey Lee Estimated construction start May 2006