2003-04 Projects from the COPs Reserve For Repairs and Renovaton (Hanes Hall)

Project Information:

Hanes Hall recently had renovations to three floors – basement, 2nd and 4th . There are two floors remaining which still contain original wiring.

This project provides funds for upgrading electrical wiring and telecom wiring on the 1st and 3rd floors - 22,000 square feet.

  • Energy Efficient Lighting
  • Utilization Devices and Switches
  • Equipment Connections
  • Basic Electrical Material (conduit, wire, etc.)
  • Telecom wiring and equipment

 