2006 Projects from the Reserve For Repairs and Renovaton (2006 R&R) Printable Version PDF List
|
|||||||||
| Year | Building | Project Category | Project Title | Project Budget |
Project Designer | Project Manager | Project Resource & FCAP Contact | Photos | Status (update April 19, 2007)) |
| Roof Repairs and Replacements | |||||||||
| 2006 | Student Recreation Center & Fetzer Gymnasium | Roof Replacement | Advanced Planning (design document) for Roof Replacement | 185,000 |
Atlas Engineering | Jerry Guerrier | Geoffrey Lee | Schematic Design | |
| 2006 | Roof Fall Protection | Roof Fall Protection | 300,000 |
Facilities Services |
Geoffrey Lee | ||||
| 2006 | Roof Fall Protection | Roof Fall Protection | 100,000 |
Pearce Brinkley Cease + Lee | Geoffrey Lee | Combined with roof replacement project. Design Development | |||
| Structural Repairs | |||||||||
| 2006 | Phillips Annex | Structural Repairs | Supplement to Current Foundation Waterproofing Project | 25,000 |
Facilities Services | Luke Hoff | Geoffrey Lee |
|
See current CIP project for more information |
| Repairs to Electrical, Plumbing and Heating, Ventilating, and Air-Conditioning Systems | |||||||||
| 2006 | Bynum Hall | Building Systems | Replace Existing Basement HVAC, Plumbing, and Electrical Systems, and Architectural Finishes | 2,300,000 |
Dianne Bachman | Brad Davis | |||
| 2006 | Woollen Gymnasium | Mechanical | Replace Bowman-Gray Swimming Pool Filtration System | 95,000 |
Karen Geer | Brad Davis | |||
| 2006 | Medical School Wings | Building Systems | Supplement to Current HVAC and Window Replacement Project | 500,000 |
Polytech, Inc. | Jerry Guerrier | Brad Davis | See current CIP project for more information. | |
| 2006 | Aycock Family Medicine | HVAC Systems | Clean HVAC Ductwork, Replace Filtration System, and Outside/Mixed Air Dampers | 150,000 |
Facilities Services | Brad Davis | |||
| 2006 | HVAC Systems | Replace HVAC Temperature Control Systems | 200,000 |
Facilities Services | Brad Davis | ||||
| 2006 | Animal Care Facility (Research Res. Facility A) | HVAC Systems | Advanced Planning for HVAC in Animal Care Facility and Master Planning for the Laboratory Animal Medicine Buildings (DLAM) | 500,000 |
Masaya Konishi | Brad Davis | |||
| 2006 | Knapp-Sanders Building | HVAC Systems | Advanced Planning to Replace 2nd & 3rd Floor HVAC Systems | 50,000 |
Craig Baker | Brad Davis | |||
| 2006 | Graham Memorial | HVAC Systems | Replace Second Boiler and Associated Piping | 20,000 |
Facilities Services | Brad Davis | |||
| 2006 | Wilson Hall & Coker Hall | Plumbing | Advanced Planning to Replace Sanitary Piping System | 350,000 |
Bill McCraw | Brad Davis | |||
| Improvements to Meet Requirements of the Americans with Disabilities Act | |||||||||
| 2006 | Bynum Hall | ADA | Install New ADA-Compliant Elevator | 500,000 |
Dianne Bachman | Geoffrey Lee | |||
| Improvements to Meet Fire Safety Needs | |||||||||
| 2006 | Fire Protection | Seal Fire-Rated Assemblies | 150,000 |
Facilities Services | Joel Carlin | ||||
| 2006 | Thurston Bowles Building & Lineberger Cancer Research | Fire Protection | Fire Alarm Networking System | 100,000 |
Facilities Services | Joel Carlin | |||
| 2006 | Coates Building | Life Safety | Advanced Planning for Life Safety Improvements | 30,000 |
Peter Krawchyk | Joel Carlin | |||
| 2006 | Woollen Gymnasium | Fire Protection | Advanced Planning for New Fire Alarm System | 25,000 |
Facilities Planning | Joel Carlin | |||
| Improvements to Existing Facilities for Energy Efficiency | |||||||||
| 2006 | Beard Hall | Window Replacement | Advanced Planning for Window Replacement | 90,000 |
Dianne Bachman | Geoffrey Lee | |||
| Improvements to Remove Asbestos, Lead Paint, and Other Contaminants, including the Removal and Replacement of Underground Storage Tanks | |||||||||
| 2006 | Berryhill Hall & Phillips Hall | Underground Storage Tanks | Remove Underground Storage Tanks | 75,000 |
Facilities Services | Joel Carlin | |||
| Improvements and Renovations to Improve Use of Existing Space | |||||||||
| 2006 | Steele Building | General Renovation | Supplement to Current General Renovation Project | 2,200,000 |
LS3P / Boney Architechts | Paul Kapp | Abbas Piran | See current CIP project for more information | |
| 2006 | Berryhill Hall | General Renovation | Supplement to Current General Renovation Project | 1,500,000 |
Integrated Design | Bill McCraw | Abbas Piran | See current CIP project for more information | |
| 2006 | Hill Hall | General Renovation | Replace Auditorium Fixed Seating, Floor and Wall Finishes | 951,000 |
Dianne Bachman | Geoffrey Lee | |||
| Improvements to Roads, Walks, Drives, and Utilities Infrastructure | |||||||||
| 2006 | Infrastructure | Infrastructural Improvements | Improvements to Campus Stormwater Infrastructure - Skipper Bowles Drive | 11,000,000 |
Keith Snead | Meg Holton | |||