2006 Projects from the Reserve For Repairs and Renovaton (2006 R&R) Printable Version PDF List
Year Building Project Category Project Title

Project Budget
($)

Project Designer Project Manager Project Resource & FCAP Contact Photos Status (update April 19, 2007))
Roof Repairs and Replacements  
2006 Student Recreation Center & Fetzer Gymnasium Roof Replacement Advanced Planning (design document) for Roof Replacement
185,000
Atlas Engineering Jerry Guerrier Geoffrey Lee Schematic Design
2006

South Building, Gardner Hall & Saunders Hall

Roof Fall Protection Roof Fall Protection
300,000

Facilities Services

Geoffrey Lee  
2006

Hanes Hall

Roof Fall Protection Roof Fall Protection
100,000
Pearce Brinkley Cease + Lee

Diane Gillis

Geoffrey Lee Combined with roof replacement project. Design Development
Structural Repairs  
2006 Phillips Annex Structural Repairs Supplement to Current Foundation Waterproofing Project
25,000
Facilities Services Luke Hoff Geoffrey Lee

See current CIP project for more information
Repairs to Electrical, Plumbing and Heating, Ventilating, and Air-Conditioning Systems  
2006 Bynum Hall Building Systems Replace Existing Basement HVAC, Plumbing, and Electrical Systems, and Architectural Finishes
2,300,000
  Dianne Bachman Brad Davis  
2006 Woollen Gymnasium Mechanical Replace Bowman-Gray Swimming Pool Filtration System
95,000
Karen Geer Brad Davis  
2006 Medical School Wings Building Systems Supplement to Current HVAC and Window Replacement Project
500,000
Polytech, Inc. Jerry Guerrier Brad Davis See current CIP project for more information.
2006 Aycock Family Medicine HVAC Systems Clean HVAC Ductwork, Replace Filtration System, and Outside/Mixed Air Dampers
150,000
  Facilities Services Brad Davis  
2006

Kerr Hall, Taylor Hall, & Friday Center

HVAC Systems Replace HVAC Temperature Control Systems
200,000
  Facilities Services Brad Davis  
2006 Animal Care Facility (Research Res. Facility A) HVAC Systems Advanced Planning for HVAC in Animal Care Facility and Master Planning for the Laboratory Animal Medicine Buildings (DLAM)
500,000
  Masaya Konishi Brad Davis  
2006 Knapp-Sanders Building HVAC Systems Advanced Planning to Replace 2nd & 3rd Floor HVAC Systems
50,000
  Craig Baker Brad Davis  
2006 Graham Memorial HVAC Systems Replace Second Boiler and Associated Piping
20,000
  Facilities Services Brad Davis  
2006 Wilson Hall & Coker Hall Plumbing Advanced Planning to Replace Sanitary Piping System
350,000
  Bill McCraw Brad Davis  
Improvements to Meet Requirements of the Americans with Disabilities Act  
2006 Bynum Hall ADA Install New ADA-Compliant Elevator
500,000
  Dianne Bachman Geoffrey Lee  
Improvements to Meet Fire Safety Needs  
2006

MacNider Hall, Bingham Hall, Taylor Hall, & Alumni Hall

Fire Protection Seal Fire-Rated Assemblies
150,000
  Facilities Services Joel Carlin  
2006 Thurston Bowles Building & Lineberger Cancer Research Fire Protection Fire Alarm Networking System
100,000
  Facilities Services Joel Carlin  
2006 Coates Building Life Safety Advanced Planning for Life Safety Improvements
30,000
  Peter Krawchyk Joel Carlin  
2006 Woollen Gymnasium Fire Protection Advanced Planning for New Fire Alarm System
25,000
Facilities Planning Joel Carlin  
Improvements to Existing Facilities for Energy Efficiency  
2006 Beard Hall Window Replacement Advanced Planning for Window Replacement
90,000
  Dianne Bachman Geoffrey Lee  
Improvements to Remove Asbestos, Lead Paint, and Other Contaminants, including the Removal and Replacement of Underground Storage Tanks  
2006 Berryhill Hall & Phillips Hall Underground Storage Tanks Remove Underground Storage Tanks
75,000
  Facilities Services Joel Carlin  
Improvements and Renovations to Improve Use of Existing Space  
2006 Steele Building General Renovation Supplement to Current General Renovation Project
2,200,000
LS3P / Boney Architechts Paul Kapp Abbas Piran See current CIP project for more information
2006 Berryhill Hall General Renovation Supplement to Current General Renovation Project
1,500,000
Integrated Design Bill McCraw Abbas Piran See current CIP project for more information
2006 Hill Hall General Renovation Replace Auditorium Fixed Seating, Floor and Wall Finishes
951,000
  Dianne Bachman Geoffrey Lee  
Improvements to Roads, Walks, Drives, and Utilities Infrastructure  
2006 Infrastructure Infrastructural Improvements Improvements to Campus Stormwater Infrastructure - Skipper Bowles Drive
11,000,000
  Keith Snead Meg Holton