2005 Projects from the Reserve For Repairs and Renovaton (2005 R&R) Printable Version PDF List
Year Building Project Category Project Title Project Budget Project Designer Project Manager Project Resource & FCAP Contact Photos Status (update March 21, 2006)
Roof Repairs and Replacements  
2005 Abernethy Hall Roof Replacement Replace Metal Shingles with Composition Shingles 225,000   Geoffrey Lee  
2005 Carroll Hall Roof Replacement Replace Slate Roof and Repairs to Cupola 400,000 Peter Krawchyk Geoffrey Lee Project kick-off February 16, 2006
2005 Walter Davis Library Roof Repair / Replacement Replace Built-Up Roof & Composition Shingles at Reading Room, Ballasted EPDM Roof for 10th Floor, and Repair Roof Sectors for 3rd, 4th & 8th Floors 350,000 Atlas Engineering Diane Gillis Geoffrey Lee Design phase
2005 Dental Office Building Roof Replacement Replace Ballasted EPDM Roof 175,000 REI Keith Snead Geoffrey Lee Estimated construction start October 2006
2005 Frances Owen Research Lab Roof Repair / Replacement Replace Covered Passage Roof and Repair Kennel Roof 80,000 A&E Services Nancy Bane Geoffrey Lee Programming & revising scope
2005 Wilson Hall Roof Replacement Replace 1964 Addition Built-Up Roof 300,000 REI Keith Snead Geoffrey Lee Estimated construction start October 2006
2005 Six Campus Buildings Roof Fall Protection Roof Fall Protection for Six Campus Buildings 200,000 A&E Services Julie Thurston Geoffrey Lee Designer selection phase
2005 New East Roof Replacement Replace Terne Metal Roof 350,000 Stafford Engineers Paul Kapp Geoffrey Lee Estimated construction start July 2006
2005 Swain Hall Roof Repair Repairs to Clay Tile Roof 66,000 Perkins & Will Dianne Bachman Geoffrey Lee See Arts Common Project Phase I
Structural Repairs  
2005 Phillips Annex Structural Repairs Foundation Waterproofing System 200,000 A&E Services Nancy Bane Geoffrey Lee

Construction documents completion March 2006
2005 Manning Hall & Alumni Hall Structural Repairs Limestone Masonry Condition Assessment Study 50,000 Joseph K. Opperman, FAIA Paul Kapp Geoffrey Lee Proposal due February 6, 2006
2005 Walter Davis Library Structural Repairs Reseal Joints at Vertically-Applied Slate and Windows at Reading Room 175,000 Atlas Engineering Diane Gillis Geoffrey Lee Design phase
Repairs to Electrical, Plumbing and Heating, Ventilating, and Air-Conditioning Systems  
2005 208 West Franklin St. HVAC Systems Supplement to HVAC Replacement Project 245,000 A&E Services Dave Mercs Brad Davis Construction phase (Supplement to 2004 R&R Project)
2005 Coates Building HVAC Improvements to HVAC System 125,000 Bill Roach Facilities Services Brad Davis Schematic design phase
2005 Hanes Hall Plumbing Replace Plumbing Piping Systems and Fixtures 800,000 Pearce Brinkley Cease + Lee Diane Gillis Brad Davis
2005 Rosenau Hall HVAC & Electrical Systems HVAC & Electrical Improvements 1,500,000 Heery International Bill McCraw Abbas Piran Supplement to Existing Renovation Project (Estimated construction start July 2007)
2005 Friday Center & Carrington Hall HVAC Systems Advanced Planning for HVAC Replacements   EIS Abbas Piran Designer selection phase
2005 Hill Hall HVAC Systems Replace two AHUs in 1961 Building 245,000 Chris Martin Facilities Services Brad Davis Construction document completion May 2006
2005 Brinkhous-Bullitt Building Elevator Systems Elevator Systems Renewal (elevator #7182) 300,000 John Hawkins Bill McCraw Geoffrey Lee
2005 Hanes Art Center & Phillips Hall HVAC Systems Advanced Planning for HVAC Replacements     EIS Brad Davis Designer selection phase
2005 MacNider Hall Elevator Systems Elevator Systems Replacement (shared elevator with Old Clinic) 610,000 John Hawkins Bill McCraw Geoffrey Lee  
2005 Greenlaw Hall Elevator Systems Elevator Systems Renewal 200,000 Davis Kane Architects Diane Gillis Geoffrey Lee
2005 Mary Ellen Jones Electrical Systems Advanced Planning for Emergency Generator Exhaust Stack Modification Requirements 20,000 A&E Services Chris Martin Joel Carlin Design phase
2005 Hamilton Hall Electrical Systems Replace Electrical Service Switchgear 115,000   Jerry Guerrier Joel Carlin Combined with Existing Renovation Project (Estimated construction completion August 2007)
2005 MacNider Hall Electrical Systems Replace Emergency Generator 175,000 Jeannette Smith Facilities Services Joel Carlin Construction document completion March 2006
2005 Battle, Vance & Pettigrew Halls HVAC Systems HVAC Repair / Replacement 225,000 A&E Services Facilities Services Brad Davis Schematic design phase
2005 Smith Hall (Playmakers Theater) Mechanical & Electrical Systems Advanced Planning for Architectural, Plumbing, Mechanical & Electrical Improvements 300,000 Ann Beha Associates Paul Kapp Geoffrey Lee Project kick-off March 9, 2006
2005 Campus YMCA HVAC & Electrical Systems HVAC & Electrical Systems Renovation Supplement 1,400,000 Pearce Brinkley Cease + Lee Paul Kapp Abbas Piran Supplement to Existing Renovation Project (Estimated construction completion January 2007)
2005 Taylor Hall & McGavran-Greenberg & Mary Ellen Jones & MBRB Mechanical & Electrical Systems Mechanical, Electrical and Lab Safety Improvements for BSL-3 450,000 A&E Services Bill Roach Abbas Piran
2005 Medical School Wings HVAC Systems HVAC Improvements for IAQ 300,000 Polytech, Inc. Jerry Guerrier Brad Davis
2005 Swain Hall HVAC Systems Replace AHU # 2 65,000   Facilities Services Brad Davis Schematic design phase
2005 Swain Hall HVAC Systems Replace AHU # 7 285,000 Perkins & Will Dianne Bachman Brad Davis Combined with Arts Common Project
Improvements to Meet Requirements of the Americans with Disabilities Act  
2005 Campus-wide ADA Continuation of Campus-wide ADA Program 350,000   Michael Pierce Geoffrey Lee Ongoing
Improvements to Meet Fire Safety Needs  
2005 Art Studio Building Fire Alarm System Install New Fire Alarm System 35,000 A&E Services Facilities Services Joel Carlin WR 38815
2005 Coates Bldg, Horney Bldg (1960 section), Art Studio & Lineberger Cancer Research Emergency & Exit Lights Replace Emergency & Exit Lights 35,000 A&E Services Jeannette Smith Joel Carlin Coates = Design / fast track
2005 Coates Building Fire Alarm System Install New Fire Alarm System 50,000 A&E Services Jeannette Smith Joel Carlin Design phase
2005 Carolina Living & Learning Center, Phase I Fire Sprinkler System Replace Existing Dry Type Fire Sprinkler System 122,900 RobsonWoese, Inc. Consulting Engineers Allen Andrews Brad Davis Estimated construction completion March 2006
Improvements to Existing Facilities for Energy Efficiency  
2005 Peabody Hall Window Replacement Window Replacement in 1960 Addition 750,000   Mary Jane Felgenhauer Geoffrey Lee Estimated construction start June 2006
Improvements and Renovations to Improve Use of Existing Space  
2005 Memorial Hall General Renovation Improvements to Existing Space 350,000 Johnson Moore & West Colloway Paul Kapp Karen Geer Completed
Improvements to Remove Asbestos, Lead Paint, and Other Contaminants, including the Removal and Replacement of Underground Storage Tanks  
2005 Fordham Hall Underground Fuel Tanks Removal of Underground Tank 25,000 A&E Services Julie Thurston Joel Carlin Design phase
Improvements to Roads, Walks, Drives, and Utilities Infrastructure  
2005 Infrastructure Infrastructural Improvements Access Road from William Blythe Drive to Hibbard Drive 750,000 Carter & Burgess Inc. John Masson Abbas Piran Supplement to Existing R&R Project
2005 Infrastructure Infrastructural Improvements Improve Domestic Water Pipeline in Arts Commons Area to Provide Fire Protection 340,000   Dianne Bachman Meg Holton
2005 Infrastructure Infrastructural Improvements Improvements to Field Stone Sidewalls along Raleigh Street 300,000 Swanson & Associates Jill Coleman Geoffrey Lee