2004 Projects from the Reserve For Repairs and Renovaton (2004 R&R) Printable Version PDF List
|
||||||||
| Year | Building | Project Category | Project Title | Project Budget | Project Designer | Planning Manager | Project Resource & FCAP Contact | Status (update March 21, 2006) |
| Roof Repairs and Replacements | ||||||||
| 2004 | Koury Natatorium | Roof Replacement | Replace EPDM roof | 470,000 | Rooftop Systems Engineers | Masaya Konishi | Geoffrey Lee | Estimated construction completion August 2006 |
| 2004 | Dean Smith Center | Roof Replacement | Coverage of the upper area of the EPDM roofing by adjoining new teflon to existing dome | 230,000 | Rooftop Systems Engineers | Masaya Konishi | Geoffrey Lee | Estimated construction completion August 2006 |
| 2004 | Morehead Planetarium | Roof Restoration | Roof replacement (six roof sectors) | 390,000 | Paul Kapp | Geoffrey Lee | Construction documents phase | |
| 2004 | Aycock Family Medicine | Roof Replacement | Roof Replacement (single ply EPDM roof sectors) | 100,000 | A&E Services | Geoffrey Lee | Completed | |
| Structural Repairs | ||||||||
| 2004 | YMCA | Structural Repairs | Foundation water-proofing | 100,000 | Sigma Stewart Eng. | Paul Kapp | Geoffrey Lee | Estimated construction completion January 2007 |
| 2004 | Art Studio Building | Structural Repairs | Structural repairs for metal roof framing | 150,000 | A&E Services | Geoffrey Lee | Completed | |
| 2004 | Dean Smith Center | Structural Repairs | Replace caulking on precast joints on the exterior of arena | 120,000 | Rooftop Systems Engineers | Masaya Konishi | Geoffrey Lee | Estimated construction completion August 2006 |
| Repairs to Electrical, Plumbing and Heating, Ventilating, and Air-Conditioning Systems | ||||||||
| 2004 | YMCA | HVAC System | Install central HVAC system | 400,000 | Sigma Stewart Eng. | Paul Kapp | Brad Davis | Estimated construction completion January 2007 |
| 2004 | YMCA | Plumbing | Replace plumbing | 150,000 | Sigma Stewart Eng. | Paul Kapp | Brad Davis | Estimated construction completion January 2007 |
| 2004 | YMCA | Electrical Systems | Upgrade lighting and electrical distribution system | 200,000 | Sigma Stewart Eng. | Paul Kapp | Joel Carlin | Estimated construction completion January 2007 |
| 2004 | 208 West Franklin Street | HVAC System | Replace HVAC components (AHUs, condensing units & temperature control systems) | 165,000 | A&E Services | David Shaffer | Brad Davis | Construction phase |
| 2004 | Mary Ellen Jones Building | Elevator Systems | Upgrade existing analog controls for elevators with digital systems | 565,922 | Donna D. Kramer, PE | Bill McGraw | Geoffrey Lee | Estimated construction completion March 2007 |
| 2004 | Hamilton Hall | Elevator Systems | Upgrade existing analog controls for elevators with digital systems | 290,000 | Jerry Guerrier | Geoffrey Lee | Construction phase | |
| 2004 | Carmichael Auditorium, Hamilton Hall, FPG Child Dev. Center#1, Francis Owen Lab | Electrical Systems | Replace / install emergency generators and automatic transfer switches | 185,000 | A&E Services | Stanley Young | Joel Carlin | Carmichael = Completed; FPG & Frances Owen = Construction phase; Hamilton = Combined with Existing Renovation Project (Estimated construction completion August 2007) |
| 2004 | Walter Davis Library | HVAC System | Advanced planning for HVAC replacement and fire protection addition | 150,000 | United Eng. / Pearce Brinkley Cease + Lee | Diane Gillis | Brad Davis | Final report received January 2006 |
| 2004 | Morehead Planetarium | HVAC System | Replace three AHUs and diffusers in Banquet Room to improve IAQ | 130,000 | Paul Kapp | Brad Davis | Project on hold | |
| 2004 | Electrical Systems | Emergency generator DOI electrical code analysis | 60,000 | A&E Services | Facilities Services | Joel Carlin | 90% completed | |
| Improvements to Meet Requirements of the Americans with Disabilities Act | ||||||||
| 2004 | Campus-wide | ADA | Continuation of campus-wide ADA program | 500,000 | Michael Pierce | Geoffrey Lee | Ongoing | |
| 2004 | Thurston-Bowles Building | ADA | Renovate 3rd floor bathroom for ADA-compliance | 125,000 | Bill McGraw | Geoffrey Lee | Construction phase | |
| Improvements to Meet Fire Safety Needs | ||||||||
| 2004 | YMCA | Fire Sprinkler System | Install fire sprinkler system | 150,000 | Sigma Stewart Eng. | Paul Kapp | Brad Davis | Estimated construction completion January 2007 |
| 2004 | Electrical Distribution Center, Nash Hall and Surplus Property Warehouse | Fire Alarm System | Install and upgrade fire alarm systems and advanced planning to network addressable fire alarm systems | 125,000 | A&E Services | Joel Carlin | Nash = Cancelled; Electrical Distribution Center & Surplus Warehouse = Construction phase | |
| Improvements to Existing Facilities for Energy Efficiency | ||||||||
| 2004 | Ambulatory Care Center | Interior | Repair and replace automatic doors | 60,000 | A&E Services | Geoffrey Lee | Completed | |
| 2004 | Thurston-Bowles Building | Air Compressors | Replace three existing 40HP lab air compressors with energy-efficient radial units | 140,000 | Dave Mercs | A&E Services | Brad Davis | Completed |
| Improvements to Remove Asbestos, Lead Paint and Other Contaminants | ||||||||
| 2004 | Morehead Chemistry Labs, Giles F. Horney Bldg and Security Services Bldg | Underground Fuel Tanks | Remove three underground steel fuel tanks and replace with above-ground tanks | 160,000 | A&E Services | Joel Carlin | Construction phase | |
| Improvements to Roads, Walks, Drives and Utilities Infrastructure | ||||||||
| 2004 | Infrastructural Improvements | Repair and resurface Friday Center Drive | 50,000 | A&E Services | Geoffrey Lee | Completed | ||